Shingle Roof Replacement in Burbank Hills from $7. Composition shingle, torn off to the deck rather than layered over. Free inspection and a written quote.
Wind is the local variable on the hillside. A Santa Ana coming down off the Verdugos lifts and creases shingle seal lines on the exposed slope, and the damage is invisible from the ground because the tab drops back into place. The slope facing the hill usually fails years before the sheltered one, which is worth knowing before you agree to replace both.
Composition shingle is the most common covering on Burbank houses and it is the one where corners get cut, because it is cheap enough that the temptation is to go fast. The two places that happens are the tear-off and the flashings.



Composition shingle runs $7 to $11 per square foot in Los Angeles, with about $8.50 being typical. National figures put it nearer $4, which is why an online estimate and a local quote look like they are describing different work. They usually are. Two things push a hillside quote up. Access -- staging and material handling on a sloping lot with a narrow street. And, inside a Very High Fire Hazard Severity Zone, a Chapter 7A Class A assembly adds roughly $1 to $5 per square foot, about 22%. Worth knowing before comparing two quotes that are not specifying the same roof.
A single-layer tear-off onto sound plywood, a simple roof with few penetrations, and a covering choice at the standard end of the architectural range.
A second or third existing layer, skip sheathing, a lot of valleys and hips, steeper pitch, or a designer-profile shingle.
Flashings. Reusing old step flashing or bedding new shingles into old mastic will leak within a few seasons no matter what the shingle cost.
Two things change up here. Access -- staging, material handling and dumpster placement are all harder on a sloping lot with a narrow street. And fire. Parts of the Burbank hillside sit in a Very High Fire Hazard Severity Zone, and inside one a re-roof is a Class A assembly under Chapter 7A rather than a choice of product. We will not tell you your parcel is in one; the state and the city both publish maps and your own address is the only one that matters.
The state fire marshal publishes a Very High Fire Hazard Severity Zone map for Burbank, and the city publishes its own Mountain Fire Zone map. Check your own parcel on both rather than taking a contractor's word for it.
Including ours. There are enough door-knockers working this valley that the checks are worth making on anybody.
Nobody can know how much decking needs replacing before the covering is off. It should be a rate per sheet in the scope, not a lump guess and not a change order.
A fire-rated assembly, a named underlayment and a cool-roof compliant product each move the price. A cheaper quote is sometimes a lesser roof rather than a better price.
A covering can look sound from the sidewalk and be finished at the laps. Insist that the roof and the roof space are both looked at before a figure is written down, ours included. What you should never accept is a number at the door, because a number at the door has to be padded to be safe.
On the hillside the replacement decision runs into the fire decision.
Tile is a Class A covering, but in a fire zone it is the assembly that is rated, not the tile on its own.
Split-level hillside houses are joined by short low-slope links between the levels, and those links are where the trouble is.
The multi-unit stock up here is condominium clusters on sloping sites, which means a board, a reserve study and a shared roof over separately owned units.
This is where the partial-versus-full decision has a genuine code cost.
Laid out 1887. Mixed-era streets, often three roofs a lot.
A 1945-50 grid, and a garage roof out the back.
Studio quarter. Controlled parking, managed loading.
Horse country. Outbuildings, and Griffith Park litter.
Half lots. All junction, no side yard.
Heavy canopy, high tile share, LADBS permits.
Dense. Small apartment blocks and LADBS permits.
What is worth knowing before you book this.
It is allowed up to a limit and it is usually the wrong call on a roof this age. An overlay hides the deck, adds weight, and sits on a surface that is no longer flat, which shortens the life of the new covering. On Burbank's older skip-sheathed houses it is worse again, because there is no solid deck to nail into.
Look at the field rather than the failure. Composition here tends to go across a whole slope at once -- granules gone, tabs brittle, seal lines broken -- rather than in patches. A bald section on an otherwise sound slope is a repair; a whole slope like that is a replacement.
Maybe, but get a second opinion before you sign anything, and never accept a price given at the door. Ask for a CSLB C-39 number and check it on the public register. That takes a minute and it is the single most effective thing you can do.
A typical single-family Burbank house is a three to five day job once it starts: tear-off and dry-in first, covering after. Tile takes longer than composition, and a lift and relay longer again because the tile is handled twice. Weather moves it, and we will not dry-in a roof we cannot finish.
No. The inspection is free, the written quote is free, and there is no obligation attached to either. What we will not do is give you a price at the door without going up.
Free inspection, and a written quote against a written scope. Every slope photographed before and after - the set is yours.