Serving Burbank and the east San Fernando Valley CSLB-licensed work only
(818) 960-6596

Our Process

How a Burbank job runs, step by step: free quote, written scope, written quote, sign-off - and the cheaper option named when there is one.

Sequence

Four steps, start to finish

Free inspection, the cool-roof position settled, then a written price.

01

Call or message

Tell us the covering, roughly how old, and what prompted the question. Most replacements are scoped from that plus a photograph before anyone travels.

02

A free inspection, and the deck question

The roof and the attic together. On Burbank's older streets the deck is frequently skip sheathing rather than plywood, and which one you have changes the price before anything else does.

03

The 50% line, established in writing

Whether the job crosses half the roof area decides what has to comply with current code. That gets settled before the scope is written, not discovered at inspection.

04

Written scope, written quote, then the work

Covering, underlayment and flashings named. Sheathing priced per sheet. The area left clean and the photographs handed over.

What it costs

Every price on one page

Estimated ranges across Los Angeles County. Your own written quote follows.

Before you replace

Some roofs that get replaced did not need to be

This is a replacement company saying so, which is the point. The most expensive mistake in this market is buying the whole roof when the job was a section of it.

01

On tile it is the starkest

A tile roof quoted at $30,000 to $60,000 for replacement is very often an $8,000 to $22,000 lift and relay, because concrete tile outlives felt by decades and only the felt has failed. Somebody has to count your tile before that question can be answered.

02

A detail fails long before a covering does

A ridge cap loosened in a Santa Ana, an upstand split by movement, a vent boot gone brittle in the heat. Repairs, all of them, in the hundreds -- and all of them regularly offered as proof that the whole roof has had it.

03

Sometimes a partial is the honest answer

A separate garage, an outbuilding, a rear addition on its own roof, or one slope that failed years ahead of the others. What we will also tell you is when a partial is just a deposit on doing the rest at a second mobilization cost.

04

Sometimes a replacement is the honest answer

When it is, we will say so plainly, because that is the same job as saying the opposite done honestly. What no homeowner should accept is either verdict without being walked through the reasoning.

Availability

The whole valley calls in the same week

Worth knowing before you start ringing round, and worth factoring into anything with a deadline on it.

Roofs here fail quietly through a dry summer -- ultraviolet light and heat working on the covering, granules washing away, laps loosening -- then a Santa Ana lifts whatever was already loose, and the first serious rain finds all of it at once. Every roofer in the east San Fernando Valley takes those calls on the same three nights.

What that means in practice: an active leak needs calling now rather than on the weekend, and a replacement tied to an escrow date or a solar install needs a survey booked well before you think you need one. Emergency call-outs carry a 20 to 30% premium for a reason -- everyone is busy at once.

Want a number on it?

A free written quote, no obligation.

Call (818) 960-6596