Apartment Roof Replacement in Burbank from $7. Occupied buildings, where the logistics are half the job. Free inspection and a written quote.
Working on an occupied Burbank building means working to the city's own construction hours and to whatever the building's parking reality is. Assigned spaces mean the dumpster has to go somewhere that is not the lot, and that has to be arranged with the city rather than negotiated with a resident on the morning.
Burbank is dense by valley standards and a lot of it is two to eight units: duplexes, fourplexes, courtyard blocks and condominium clusters. Replacing a roof on one is a different job from replacing a roof on a house, and almost none of the difference is on the roof.



Multi-family is quoted per building, not per unit. The material rates are the same Los Angeles numbers -- $7 to $11 per square foot on composition, $2.50 to $7.00 for a low-slope coating -- but the roof area on a small block is typically two to four times a house's, and the logistics are a real line rather than a rounding error. The variable that moves a Burbank quote most is the deck. Skip sheathing on the older stock has to be overlaid before a modern covering goes down, and that is a real cost that a quote written without going up there will not contain. Ask which deck yours is.
Staging, dumpster placement, resident notice, parking displacement and a sequence that never leaves an occupied unit under an open roof overnight.
Third-story access with no loading zone, a parapet and coping that need rebuilding, and plant on the roof.
Roof area per building and the covering specification, so the reserve study can be updated from the document rather than re-measured later.
Mixed-era streets mean mixed-era roofs, and frequently several of them on one property: the original house, a rear addition on its own slope, a detached garage re-roofed at some other time. Tile and composition both have real share here, so a Burbank roofer has to price both properly rather than defaulting to one.
Burbank was laid out in 1887 and incorporated in 1911, which makes its oldest residential streets a generation older than most of the San Fernando Valley.
It is access, staging and notice. Where does the dumpster go when every space is assigned parking. Which units lose access and for how long. How does material get to a third-story roof on a street with no loading zone. What time can work start without a noise complaint. Those answers belong in the quote, because they are what determines whether the job runs to schedule.
Including ours. There are enough door-knockers working this valley that the checks are worth making on anybody.
An overlay is cheaper on the day and hides the deck. If two quotes are thousands apart, this is the first place to look, and it should be written down either way.
A fire-rated assembly, a named underlayment and a cool-roof compliant product each move the price. A cheaper quote is sometimes a lesser roof rather than a better price.
A covering can look sound from the sidewalk and be finished at the laps. Insist that the roof and the roof space are both looked at before a figure is written down, ours included. What you should never accept is a number at the door, because a number at the door has to be padded to be safe.
Burbank was laid out in 1887 and incorporated in 1911, which makes its oldest residential streets a generation older than most of the San Fernando Valley.
On Burbank's older stock the risk is the profile.
The reason an overlay is a bad idea on an older Burbank house is underneath it.
Here is the rule that catches Burbank homeowners out.
Partial genuinely is the right answer more often in Burbank than elsewhere, because so many properties carry two or three roofs of different ages.
A 1945-50 grid, and a garage roof out the back.
Studio quarter. Controlled parking, managed loading.
Verdugo slopes. Fire zone at the margins, hard access.
Horse country. Outbuildings, and Griffith Park litter.
Half lots. All junction, no side yard.
Heavy canopy, high tile share, LADBS permits.
Dense. Small apartment blocks and LADBS permits.
What is worth knowing before you book this.
Noise for most of the working day, a dumpster somewhere that was probably parking, and restricted access to part of the building while a section is open. What should not happen is an occupied unit left under an open roof overnight, and the sequence in the quote is what prevents that.
Roof area stated per building, the covering and underlayment specification named, and the work scoped building by building rather than as one figure. A board should be able to approve it and a reserve schedule should be updatable from it without anyone re-measuring.
A full replacement in Los Angeles County is estimated at $10,000 to $25,000 for most houses. Composition shingle runs $7 to $11 per square foot here and tile $15 to $25. The range is wide because covering, pitch, access and what the old roof was hiding all move it, which is why the inspection is free and the quote is written down.
Sometimes less would do, and we will say so. A tile roof is very often a lift and relay at roughly half the price. A confined failure on a separate structure is a partial. The test is whether the covering away from the failure still has life in it, and you should be shown the evidence either way.
Maybe, but get a second opinion before you sign anything, and never accept a price given at the door. Ask for a CSLB C-39 number and check it on the public register. That takes a minute and it is the single most effective thing you can do.
Free inspection, and a written quote against a written scope. Every slope photographed before and after - the set is yours.