Roof Replacement in Burbank Hills from $10,000. Full tear-off, deck inspected sheet by sheet, priced before anything comes off. Free inspection and a written quote.
On the hillside the replacement decision runs into the fire decision. Parts of the Burbank hills sit in a Very High Fire Hazard Severity Zone, and once a job crosses more than half the roof area the whole roof has to comply -- which inside one of those zones means a Class A assembly under Chapter 7A, not just a Class A shingle. Check your own parcel on the state and city maps before anyone prices it.
Burbank housing is older and tighter than the post-war tracts further out in the valley, and it is mixed: streets here can carry a 1920s house, a 1940s tract house and a 1960s addition within a few doors of each other. That matters because a replacement quote written off a drive-by assumes one roof, and these are frequently three roofs joined together.



A full replacement in Los Angeles County is estimated at $10,000 to $25,000 for most houses. The range is that wide because covering, pitch, access and what the old roof was hiding all move it -- which is why the survey comes before the number. Two things push a hillside quote up. Access -- staging and material handling on a sloping lot with a narrow street. And, inside a Very High Fire Hazard Severity Zone, a Chapter 7A Class A assembly adds roughly $1 to $5 per square foot, about 22%. Worth knowing before comparing two quotes that are not specifying the same roof.
A simple roof shape, easy street access, a plywood deck in good condition, and booking outside the winter rush when every roofer in the valley is on a ladder.
Skip sheathing that has to be overlaid, a second story, tile rather than composition, a sloping lot, or soft decking found once the covering is off.
Sheathing replacement priced per sheet, the tear-off included or excluded, and the underlayment actually named. Those three account for most of the gap between quotes.
The hillside above the city, rising toward the Verdugo Mountains.
Larger houses on sloping lots, with the kind of roof geometry that comes from building into a hill: split levels, multiple ridges and long valleys.
Two things change up here. Access -- staging, material handling and dumpster placement are all harder on a sloping lot with a narrow street. And fire. Parts of the Burbank hillside sit in a Very High Fire Hazard Severity Zone, and inside one a re-roof is a Class A assembly under Chapter 7A rather than a choice of product. We will not tell you your parcel is in one; the state and the city both publish maps and your own address is the only one that matters.
The state fire marshal publishes a Very High Fire Hazard Severity Zone map for Burbank, and the city publishes its own Mountain Fire Zone map. Check your own parcel on both rather than taking a contractor's word for it.
This is a replacement company saying so, which is the point. The most expensive mistake in this market is buying the whole roof when the job was a section of it.
A tile roof quoted at $30,000 to $60,000 for replacement is very often an $8,000 to $22,000 lift and relay, because concrete tile outlives felt by decades and only the felt has failed. Somebody has to count your tile before that question can be answered.
A separate garage, an outbuilding, a rear addition on its own roof, or one slope that failed years ahead of the others. What we will also tell you is when a partial is just a deposit on doing the rest at a second mobilization cost.
When it is, we will say so plainly, because that is the same job as saying the opposite done honestly. What no homeowner should accept is either verdict without being walked through the reasoning.
Tile is a Class A covering, but in a fire zone it is the assembly that is rated, not the tile on its own.
Wind is the local variable on the hillside.
Split-level hillside houses are joined by short low-slope links between the levels, and those links are where the trouble is.
The multi-unit stock up here is condominium clusters on sloping sites, which means a board, a reserve study and a shared roof over separately owned units.
This is where the partial-versus-full decision has a genuine code cost.
Laid out 1887. Mixed-era streets, often three roofs a lot.
A 1945-50 grid, and a garage roof out the back.
Studio quarter. Controlled parking, managed loading.
Horse country. Outbuildings, and Griffith Park litter.
Half lots. All junction, no side yard.
Heavy canopy, high tile share, LADBS permits.
Dense. Small apartment blocks and LADBS permits.
What is worth knowing before you book this.
Usually because they are not the same roof. Check whether each one includes a full tear-off, how sheathing replacement is priced, and what underlayment is specified. Those three account for most of the spread you are looking at.
It is a deck of spaced boards rather than continuous plywood, common on Burbank's older houses because it was built for wood shake. A modern covering cannot be nailed into the gaps, so the deck has to be overlaid or replaced first. It is a real cost and it should appear on the quote, not after the tear-off.
Maybe, but get a second opinion before you sign anything, and never accept a price given at the door. Ask for a CSLB C-39 number and check it on the public register. That takes a minute and it is the single most effective thing you can do.
A typical single-family Burbank house is a three to five day job once it starts: tear-off and dry-in first, covering after. Tile takes longer than composition, and a lift and relay longer again because the tile is handled twice. Weather moves it, and we will not dry-in a roof we cannot finish.
No. The inspection is free, the written quote is free, and there is no obligation attached to either. What we will not do is give you a price at the door without going up.
Free inspection, and a written quote against a written scope. Every slope photographed before and after - the set is yours.