Flat Roof Replacement in Burbank Hills from $2.50. Low slope over additions, garages and mid-century houses -- and the one Title 24 rule with no exemption. Free inspection and a written quote.
Split-level hillside houses are joined by short low-slope links between the levels, and those links are where the trouble is. The run is too short to get real fall into, so the water leaves slowly and the junction with the pitched roof above takes the load. Replacing the membrane without addressing the fall buys a few seasons.
Burbank has a great deal of low-slope roof that is not on a commercial building: rear additions, converted garages, carport roofs, patio covers tied into the main house, and genuinely flat mid-century houses. All of it sheds water slowly, which means it depends on the drainage working rather than on gravity doing the job for it.



If the substrate is sound and dry, a coating at $2.50 to $7.00 per square foot is often the right answer and by some distance the cheapest. A full low-slope replacement is quoted against the system and the drainage work it needs, and on a house it normally sits at the lower end of the $10,000 to $25,000 replacement range rather than the top. Two things push a hillside quote up. Access -- staging and material handling on a sloping lot with a narrow street. And, inside a Very High Fire Hazard Severity Zone, a Chapter 7A Class A assembly adds roughly $1 to $5 per square foot, about 22%. Worth knowing before comparing two quotes that are not specifying the same roof.
A sound, dry substrate can be coated. We establish whether yours is before quoting a replacement, because coating a wet roof seals the moisture in and buys about a year.
Fall that has to be rebuilt rather than re-covered, wet insulation, new or enlarged outlets, and roof-mounted equipment that has to be lifted and re-flashed.
Cool-roof compliance. Low slope has to meet it in every California climate zone once more than half the area is replaced, and the product's rating belongs on the quote.
Two things change up here. Access -- staging, material handling and dumpster placement are all harder on a sloping lot with a narrow street. And fire. Parts of the Burbank hillside sit in a Very High Fire Hazard Severity Zone, and inside one a re-roof is a Class A assembly under Chapter 7A rather than a choice of product. We will not tell you your parcel is in one; the state and the city both publish maps and your own address is the only one that matters.
The state fire marshal publishes a Very High Fire Hazard Severity Zone map for Burbank, and the city publishes its own Mountain Fire Zone map. Check your own parcel on both rather than taking a contractor's word for it.
Including ours. There are enough door-knockers working this valley that the checks are worth making on anybody.
California licenses roofing under classification C-39, and the register is public and searchable in about a minute. Ask for the number before the work, not after it.
A fire-rated assembly, a named underlayment and a cool-roof compliant product each move the price. A cheaper quote is sometimes a lesser roof rather than a better price.
A covering can look sound from the sidewalk and be finished at the laps. Insist that the roof and the roof space are both looked at before a figure is written down, ours included. What you should never accept is a number at the door, because a number at the door has to be padded to be safe.
On the hillside the replacement decision runs into the fire decision.
Tile is a Class A covering, but in a fire zone it is the assembly that is rated, not the tile on its own.
Wind is the local variable on the hillside.
The multi-unit stock up here is condominium clusters on sloping sites, which means a board, a reserve study and a shared roof over separately owned units.
This is where the partial-versus-full decision has a genuine code cost.
Laid out 1887. Mixed-era streets, often three roofs a lot.
A 1945-50 grid, and a garage roof out the back.
Studio quarter. Controlled parking, managed loading.
Horse country. Outbuildings, and Griffith Park litter.
Half lots. All junction, no side yard.
Heavy canopy, high tile share, LADBS permits.
Dense. Small apartment blocks and LADBS permits.
What is worth knowing before you book this.
Water still sitting 48 hours after rain means the fall is wrong or a drain is not working. Not an emergency this week, but it is what turns a small repair into a deck replacement if it is left for a couple of winters.
If the substrate is sound and dry, yes -- $2.50 to $7.00 per square foot, and it is often the right answer. If it is not sound, coating seals the moisture in and buys about a year. We establish which you have before quoting either.
Maybe, but get a second opinion before you sign anything, and never accept a price given at the door. Ask for a CSLB C-39 number and check it on the public register. That takes a minute and it is the single most effective thing you can do.
A typical single-family Burbank house is a three to five day job once it starts: tear-off and dry-in first, covering after. Tile takes longer than composition, and a lift and relay longer again because the tile is handled twice. Weather moves it, and we will not dry-in a roof we cannot finish.
No. The inspection is free, the written quote is free, and there is no obligation attached to either. What we will not do is give you a price at the door without going up.
Free inspection, and a written quote against a written scope. Every slope photographed before and after - the set is yours.